Back to article
STUDIOX NEWS
Friday, November 20, 2026ePaperstudioxnews.ca
Cape Breton

Catalone Lake bridge replacement closure runs through November 30

By StudioX News Atlantic Desk

Travellers between Catalone Gut and Bateston should follow the detour around Catalone Lake Truss Bridge on Mira Bay Drive.

Nova Scotia’s November 20 bulletin lists the replacement closure through November 30, with signs and traffic control in place. The listed end date is not confirmation of reopening.

Source: Nova Scotia Public Works, published November 20, 2026.

Read online: https://studioxnews.ca/canada/nova-scotia/cape-breton/catalone-lake-bridge-replacement-closure-runs-through-november-30/© 2026 StudioX News